top of page
Paul Critchley Vox.JPG

Psalm 65: Praise awaits you God in Zion

Blue Waves CD Album Cover 2.jpg
spotify-removebg-preview.png
kisspng-computer-icons-itunes-portable-network-graphics-cl-web-store-5cdee593d8b936.505404
62b1e81756b6848f8bec9037.png
Listen on Spotify, Amazon or Apple Music

Praise awaits you God in Zion,

We’ll fulfil our vows to you.

To you LORD who hear us praying,

Men will come, all men come,

They will come and praise your name.        


When transgressions overwhelmed us,

You forgave us all our sin.

We are blessed as you do draw us:

Those you sought fill your courts, 

Sharing in good things you have made.


God our Saviour you have answered

And performed with righteousness,

Awesome deeds, that speak to nations;

Bringing hope, saving hope, 

Over land and farthest seas.


By your power you formed the mountains;

You have armed yourself with strength.

You have stilled the roaring waters;

Seas that roar, roar no more.

You have stilled the raging waves.


And the turmoil of the nations,

You have stilled by your great strength.

Peoples far off fear your wonders;

There’ll be joy, songs of joy,

Joy from dawn to evening shade.


For the land you care and water,

You enrich abundantly.

Streams from God are filled with water,

Showers of rain, bring forth grain;

For you’ve said, ‘men will have bread’.  


And you drench the farmers furrows,

Level ridges, blessing crops.

Then you crown the earth with bounty;

All that grows, overflows,

In abundance overflows.


And the desert grasslands flourish,

Hills with gladness they are filled.

In the meadows flocks are grazing;

Corn abounds, valleys sound,

With glad songs and shouts of joy.

Jeff Lowe: Lead vocal, piano, guitars, psaltery, concertina, synth- pad , bass, drums

Paul Bellingham: piano

Psalm 65 Reflection

Psalm 65 Hymn of Thanksgiving


Hebrew title is ‘by David’. The psalm may have been used at the harvest festival. All praise to God who hears and forgives faults, who blesses, satisfies and saves. Praise to God the creator and controller of the natural world. Praise to God who gives the harvest and makes the whole earth ring with joy.


The Lion handbook of the Bible 2002

© Jeff Lowe Psalms Project

Created with Paul Critchley

bottom of page