
Psalm 46: God is our strength

Listen on Spotify, Amazon or Apple Music
God is our strength,
God is our refuge.
He’s always near,
Helps us in trouble.
So we’ll not fear
Although the earth gives way
Beneath our feet.
Though mountains quake,
At the sea’s surging.
And though they fall
Into the seething heart of the sea.
Yet we’ll not fear
For God is by our side.
And there is a river whose streams make glad
The Holy City of God.
And God Most High, he dwells in her
And she shall never fall.
H’ell help her at the breaking of the day.
Kingdom’s will fall,
Nations are in uproar.
God lifts his voice;
He makes the earth melt.
But God is near
God is our strength,
Our fortress and our guide.
Come then and see
All that the Lord has
Done In the earth;
See the devastation.
But wars will cease
He’ll break the bow and spear
Burn the sword with fire.
Be still and know that I am God
And I’ll be lifted high.
Exalted above the kings of earth.
The LORD God is with us;
Our fortress, Jacob’s God protecting us.
God is our strength,
God is our refuge. (x3)
He’s always near!
Jeff Lowe: lead vocal, backing vocal, piano, guitars, keys, bass

Psalm 46 Reflection
Psalm 46 a mighty Fortress is our God
This song - the one on which Luther based a famous hymn- may have been written following King Sennacherib of Assyria’s; attack on Jerusalem; some natural disaster, or in anticipation of the events heralding Messiah‘s coming. Versus 4 to 5 have a parallel in revelation 22 1 to 5, where the ideal is perfectly realised. The psalmist glories in God’s presence with his people and his real and unassailable protection.
The Lion handbook of the Bible 2002


