

Dives and Lazarus

Well it fell out upon one day rich Diverus he gave a feast
And invited all his neighbours in and gentry of the best
And it fell out upon that day poor Lazarus he was so poor
He came and laid him down and down even down at Diverus door
Well Lazarus laid him down and down even down at Diverus door
Some meat some drink brother Diverus to bestow upon the poor
Thou art none of mine brother Lazarus lying begging at my door
No meat no drink will I give to thee or bestow upon the poor
Well Lazarus laid him down and down even down at Diverus wall
Some meat some drink brother Diverus or surely starve I shall
Thou art none of mine brother Lazarus lying begging at my wall
No meat no drink will I give to thee and surely starve you shall
Then Lazarus laid him down and down even down at Diverus gate
Some meat some drink brother Diverus for Jesus Christ his sake
Thou art none of mine brother Lazarus lying begging at my gate
No meat no drink will I give to thee for Jesus Christ's sake
Then Diverus sent out his merry men all for to whip poor Lazarus away
But they had no power to whip one whip and threw their whips away
Then Diverus sent out his hungry dogs for to bite poor Lazarus away
They had no power to bite one bite but licked his wounds away
Well it fell out upon one day poor Lazarus he sickened and died
And they sent three angels out of heaven his soul there for to guide
Rise up rise up brother Lazarus and come along with me
There is a place prepared in heaven to sit upon an angel’s knee.
Then it fell out upon one day rich Diverus he sickened and died
And they sent three serpents out of hell his soul there for to guide
Rise up rise up brother Diverus and come along with me
There is a place prepared in hell to sit upon a serpents knee.

